P.zza Cesare Battisti, 6

Wire Rope Type - Bemposta

Wire Rope Type

Deep intakes up to 100m/300

  • Existing civil structures needing a rope type TRCM
  • Tilted trash racks
  • Restricted space conditions on the site

DAILY CLEANING CAPACITY: up to 1000 ton/day

HPP/site: BEMPOSTA (Portugal)

River

Duero

Customer

Andritz EDP

Object

Design, supply and installa􏰀on of the TRCM

Front of grid

27 mt

Cleaning depth

39 mt

Rack inclination

25 °

Width of bucket

3,0 mt

Bucket weight

3600 kg

Bucket lifting capacity

4000 kg

Daily cleaning capacity

700 ton/day

Equipped with:

  • Totally automatic and manual command
  • BUCKET lifted by ropes, able to operate more than 30 m depth
  • OPENING and CLOSING of the jaw by ropes
  • ROTATING JIB CRANE within a radius of 5 m able to lift heavy objects from water up to 5 ton
  • OWN CONTAINER to collect and transport debris until the discharge point